Under construction

Progress
75%

Rehabilitation of the Road Pavement on Route G82.2 M5 – Sireți – Roșcani – R1

 

Rehabilitation of the Road Pavement on Route G82.2 M5 – Sireți – Roșcani – R1 aimed to improve the technical condition of the road and enhance traffic safety. The works included milling of damaged sections, pothole repairs, and the application of a new asphalt concrete layer, ensuring a smooth and durable driving surface. Additionally, side roads were improved, new curbs were installed, and road shoulders were reinforced to increase roadway stability. Throughout the entire route, road signs and other safety elements were installed to ensure safer conditions for all road users.

Beneficiary ”Administrația Națională a Drumurilor”S.A. The term of execution 20.10.2025

Stages

  • 1
    Milling and leveling of the roadway to prepare the road surface for rehabilitation.
  • 2
    Construction of the drainage and foundation layers to ensure road stability and proper water drainage.
  • 3
    Pothole repair and application of leveling layers to strengthen the road structure.
  • 4
    Laying the final asphalt surface, providing a durable and safe driving surface.
  • 5
    Improvement of side roads to provide safe and convenient access to the main route.
  • 6
    Installation of curbs to separate the roadway from sidewalks and adjacent areas.
  • 7
    Installation of traffic signs, road markings, and other safety elements.
  • 8
    Bridge repair works to ensure its safety and long-term durability.